Triple layer bitumen felt system

Cost: £85,000

Time: 9 weeks

This Grade 2 listed building in the centre of Blackburn had been neglected for a number of years and was suffering from large scale water ingress.

The roof had previously been overlaid, however these had been unsuccessful. Following an extensive intrusive survey, a new triple layer bitumen felt system was specified with a 25mm insulation board, due to height restrictions. This was backed up by a 20 year single point warranty.

Talk to us about a roofing or guttering quote :  GET IN TOUCH TODAY

.